57.7 F
Winter Haven
Monday, December 23, 2024
- Advertisement -

FDOT Begins Resurfacing Project on SR 559 in Auburndale

- Advertisement -

Must Read

The FDOT has begun a resurfacing project on SR 559 from Interstate 4 to SR 33. The project includes:

  • Milling and resurfacing the roadway 
  • Asphalt driveway reconstruction 
  • Shoulder widening
  • Turn lane reconstruction
  • Widening for keyhole bike lanes at the turn lanes
  • New traffic signals with supplemental lighting at the SR 559 and I-4 ramps 

Crews will work on signals for the week of November 23 to November 30. Watch for shoulder closures on the bridge above I-4. Use caution and be prepared to merge or stop.

author avatar
Allison
- Advertisement -

Latest News

Polk County Sheriff’s Office Arrests Man for Touching 16-Year-Old Girl at Lakeland Restaurant

A 57-year-old man was arrested by the Polk County Sheriff’s Office on Thursday, December 19, 2024, after an investigation...
- Advertisement -

More Articles Like This

- Advertisement -